<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Squarespace V5 Site Server v5.13.594-SNAPSHOT-1 (http://www.squarespace.com) on Fri, 12 Jun 2026 02:09:20 GMT--><rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:media="http://search.yahoo.com/mrss" version="2.0"><channel><title>113 Main St.</title><generator>Squarespace V5 Site Server v5.13.594-SNAPSHOT-1 (http://www.squarespace.com)</generator><item><title>DHCR</title><link>http://pbinc.org/picture/uploaded-file-51272?pictureId=4203329</link><description>&lt;p&gt;&lt;span class="full-image-float-right ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 200px;" src="/storage/DHCR.jpg?__SQUARESPACE_CACHEVERSION=1263676389517" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;This project is made possible in part with funds from the NYS Housing Trust Fund Corporation with a Rural Area Revitalization Program grant received in 2009, and funding received from the NYS Office of Community Renewal NY Main Street grant program.&lt;/p&gt; &lt;p&gt;Project - turn this 1970 barber shop into a green energy efficient building to house offices of PB Inc and Resource Center to continue providing programs aimed at Main St revitalization, affordable housing solutions, small business programs, and community arts.&amp;nbsp; Philmont Beautification, Inc. is a grass-roots not-for-profit community organization committed to serving charitable programs aimed at revitalization and community enhancement.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-51272?pictureId=4203329&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-51272?pictureId=4203329&amp;asGalleryImage=true"/></item><item><title>Stabalizing the building</title><link>http://pbinc.org/picture/uploaded-file-56281?pictureId=4203330</link><description>&lt;p&gt;&lt;span class="full-image-block ssNonEditable"&gt;&lt;span&gt;&lt;img src="/storage/LVLs.jpg?__SQUARESPACE_CACHEVERSION=1263680129468" alt="" width="211" height="157" /&gt;&lt;/span&gt;&lt;/span&gt;Installation of LVLs on both the East and West facades to stabilize the building while new block and framing was installed to raise the building by 12 inches.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-56281?pictureId=4203330&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-56281?pictureId=4203330&amp;asGalleryImage=true"/></item><item><title>Sam Wright</title><link>http://pbinc.org/picture/uploaded-file-76253?pictureId=4203331</link><description>&lt;p&gt;Sam Wright, principle of Hemlock Hollow Farm / General Contractor, assisted Sally Baker, Executive Director of PB Inc. with the design of the building, consulted on the engineering issues involved with substantial rain water run off experienced from surrounding higher elevations, attended the many meetings required with the Building Department and Village of Philmont for permits, and assembled the local crew to execute the project.&amp;nbsp; Thank you Sam!&amp;nbsp;&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-76253?pictureId=4203331&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-76253?pictureId=4203331&amp;asGalleryImage=true"/></item><item><title>Masonary - New Block</title><link>http://pbinc.org/picture/masonary?pictureId=4203332</link><description>&lt;p&gt;Both the East and West walls required new block to be laid up and the removal of decayed framing and plywood due to rain water run off.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/masonary?pictureId=4203332&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/masonary?pictureId=4203332&amp;asGalleryImage=true"/></item><item><title>Ben Hart - Mason</title><link>http://pbinc.org/picture/uploaded-file-63758?pictureId=4203333</link><description>&lt;p&gt;Thank you Ben for your excellent work!&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-63758?pictureId=4203333&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-63758?pictureId=4203333&amp;asGalleryImage=true"/></item><item><title>Concrete Forms</title><link>http://pbinc.org/picture/uploaded-file-20210?pictureId=4203335</link><description>&lt;p&gt;Ben Hart the mason and Todd Tyler preparing the concrete forms for the new floor to be poured.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-20210?pictureId=4203335&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-20210?pictureId=4203335&amp;asGalleryImage=true"/></item><item><title>building stripped 4.jpg</title><link>http://pbinc.org/picture/building%20stripped%204.jpg?pictureId=4203336</link><media:thumbnail url="http://pbinc.org/picture/building%20stripped%204.jpg?pictureId=4203336&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/building%20stripped%204.jpg?pictureId=4203336&amp;asGalleryImage=true"/></item><item><title>Radiant Tubing</title><link>http://pbinc.org/picture/uploaded-file-84481?pictureId=4203339</link><description>&lt;p&gt;&lt;span class="full-image-block ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 150px;" src="/storage/wire mesh down 5.jpg?__SQUARESPACE_CACHEVERSION=1263680495494" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;Heat supply - radiant heat/cool tubing installed by Green Earth Geothermal located in Schodack Landing, NY&amp;nbsp; supplied by two geothermal wells drilled in July 2009.&amp;nbsp; Philmont's rock is the best(!)for geothermal installations!&amp;nbsp; Thank you Andy Aubin, principle of Green Earth Geothermal!&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-84481?pictureId=4203339&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-84481?pictureId=4203339&amp;asGalleryImage=true"/></item><item><title>New Main St. storefront</title><link>http://pbinc.org/picture/uploaded-file-14707?pictureId=4203340</link><description>&lt;p&gt;Josh Sonner of May Hill Timber Frames installing the new framing for the facades and rafters.&amp;nbsp; Roof receives a new pitch and gable end overhang to protect the new Main St. shopfront when it rains.&amp;nbsp;&amp;nbsp; Thank you Josh, Caspar, and Todd!&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-14707?pictureId=4203340&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-14707?pictureId=4203340&amp;asGalleryImage=true"/></item><item><title>May Hill Framers</title><link>http://pbinc.org/picture/uploaded-file-73364?pictureId=4203341</link><description>&lt;p&gt;&lt;span class="full-image-float-right ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 150px;" src="/storage/caspar.jpg?__SQUARESPACE_CACHEVERSION=1263680765172" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;Thank you Caspar, principle of May Hill Timber Frames, Ghent - beautiful work!&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-73364?pictureId=4203341&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-73364?pictureId=4203341&amp;asGalleryImage=true"/></item><item><title>roof rafters.jpg</title><link>http://pbinc.org/picture/roof%20rafters.jpg?pictureId=4203342</link><description>&lt;p&gt;&lt;span class="full-image-block ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 150px;" src="/storage/rafters on.jpg?__SQUARESPACE_CACHEVERSION=1263681537963" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/roof%20rafters.jpg?pictureId=4203342&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/roof%20rafters.jpg?pictureId=4203342&amp;asGalleryImage=true"/></item><item><title>todd-framing.jpg</title><link>http://pbinc.org/picture/todd-framing.jpg?pictureId=4203343</link><description>&lt;p&gt;&lt;span class="full-image-block ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 150px;" src="/storage/Todd-roofing.jpg?__SQUARESPACE_CACHEVERSION=1263681702030" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/todd-framing.jpg?pictureId=4203343&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/todd-framing.jpg?pictureId=4203343&amp;asGalleryImage=true"/></item><item><title>facade in progress.jpg</title><link>http://pbinc.org/picture/facade%20in%20progress.jpg?pictureId=4203344</link><media:thumbnail url="http://pbinc.org/picture/facade%20in%20progress.jpg?pictureId=4203344&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/facade%20in%20progress.jpg?pictureId=4203344&amp;asGalleryImage=true"/></item><item><title>East Facade in progress.</title><link>http://pbinc.org/picture/uploaded-file-28335?pictureId=4203345</link><description>&lt;p&gt;New roof is on - 1-15-10&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-28335?pictureId=4203345&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-28335?pictureId=4203345&amp;asGalleryImage=true"/></item><item><title>Tom Richards - Enterprises./ Philmont</title><link>http://pbinc.org/picture/uploaded-file-86267?pictureId=4203800</link><description>&lt;p&gt;Thank you Tom Richards, (TR Enterprises, Philmont)&amp;nbsp; and Josh Wildermuth - a new concrete floor in record time!&amp;nbsp; Great work.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-86267?pictureId=4203800&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-86267?pictureId=4203800&amp;asGalleryImage=true"/></item><item><title>concrete pour.jpg</title><link>http://pbinc.org/picture/concrete%20pour.jpg?pictureId=4203801</link><description>&lt;p&gt;&lt;span class="full-image-block ssNonEditable"&gt;&lt;span&gt;&lt;img style="width: 150px;" src="/storage/Josh Wildermuth.jpg?__SQUARESPACE_CACHEVERSION=1263681097036" alt="" /&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt; &lt;p&gt;Concrete pour day. &amp;nbsp; Sam Wright, Tom Richards, and Josh Widermuth.&amp;nbsp; Thank you guys - great work!&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/concrete%20pour.jpg?pictureId=4203801&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/concrete%20pour.jpg?pictureId=4203801&amp;asGalleryImage=true"/></item><item><title>concrete pour-Stickles</title><link>http://pbinc.org/picture/uploaded-file-18872?pictureId=4203805</link><media:thumbnail url="http://pbinc.org/picture/uploaded-file-18872?pictureId=4203805&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-18872?pictureId=4203805&amp;asGalleryImage=true"/></item><item><title>350 action day.jpg</title><link>http://pbinc.org/picture/uploaded-file-14207?pictureId=4209504</link><description>&lt;p&gt;Over 60 Philmont residents joined us on 24th October, 2009 to turn the West facade into a 350 Climate Day action consisting of ways to reduce Co2 emissions through everyday actions, everyone can take.&amp;nbsp; To see more photographs and media coverage of this event please visit page&lt;a href="http://www.pbinc.org/news-events/"&gt; http://www.pbinc.org/news-events/&lt;/a&gt;&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/uploaded-file-14207?pictureId=4209504&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/uploaded-file-14207?pictureId=4209504&amp;asGalleryImage=true"/></item><item><title>113 Main / AFTER.jpg</title><link>http://pbinc.org/picture/113%20Main%20%20AFTER.jpg?pictureId=20811807</link><description>&lt;p&gt;Comunity programming including art exhibitions, craft Pop-Up shows, program meetings.&lt;/p&gt;</description><media:thumbnail url="http://pbinc.org/picture/113%20Main%20%20AFTER.jpg?pictureId=20811807&amp;asThumbnail=true"/><media:content url="http://pbinc.org/picture/113%20Main%20%20AFTER.jpg?pictureId=20811807&amp;asGalleryImage=true"/></item></channel></rss>